I dont have any pictures, but I was able to get the outside light relocated next to the door. I ran the wiring, hooked it up to the switch, put the fuse back in the main panel and.....voila! We have light! I built the frame for the actual wall in the garage. It's ready to go once I pull up the old 2 x 4 that is nailed into the concrete. Liquid Nails is on deck for this portion of the job. Now only 2 more switches to wire...wall to install...drywall...sanding..........(sigh)........